Configure Multiple Baselines

  • Updated

This article explains how to set up multiple baselines for your work planner.

This article requires the Work Plan app to be installed.

By default, OnePlan only has one baseline configured (Baseline 0). You can configure up to 11 baselines total.

To configure a new baseline

  1. From a Plan, go to the Work Plan List > ellipsis menu (...) > Configure. The Work Plan configuration form will open.

    Access_Work_Type_Configuration.png
  2. In the Configure tab, under the Baselines header, click the Add icon (+), and the New Baseline form will open.

  3. Complete the Add Baseline form.

    • Index: Select the index number for the new baseline. The out of the box baseline has an index of 0. So the next logical baseline index is 1, and so on.

    • Name: Enter a name for the baseline.

    • Work Fields: Select the work fields that will be snapshotted/saved when the user saves a baseline.

  4. Click Add.

Create_New_Baseline.png