This article lists and describes common errors that may occur with the MS365 Planner integration.
Cannot perform runtime binding on a null reference.
The M365 Planner strategy is scheduled to run. This type of integration cannot be scheduled. These strategies should be removed from the Schedules list and only be triggered as an event within the Connected Systems button in OnePlan.
Comments
0 comments
Article is closed for comments.