Wrike Integration - Default Field Mappings and Scheduled Strategies

  • Updated

This article details the default field mappings and scheduled strategies installed with the Wrike with OnePlan integration.

Integration Information

OnePlan Changes

Once the install is complete, three things will occur in the OnePlan integration page:

  1. Integration Line-Item Creation.
  2. Wrike Availability in Connected Systems.

Integration Line-item Details

Each entry in the Integration section provides an overview of OneConnect Integrations associated with the OnePlan Work Plan, offering a comprehensive list of connected systems.

 

Identifying Connected Systems

Any item connected to Wrike will display the Wrike icon on both the My Portfolio page and the Work Plan Backlog page, indicating the association between plans/tasks and Wrike.

Connecting Items

To link an item from OnePlan to Wrike:

  • Navigate to the Work Plan – Backlog page.
  • Click on the plug icon (Connected Systems Icon).
  • Select the option to connect to an existing item in Wrike.

Once connected, the Connected Systems window allows for Import, Export, or Opening of the Wrike plan-level item.

Default Field Mappings

Plans - Projects

OnePlan Fields Wrike Fields Direction Notes
Name Title Both Required
Owner OwnerIds Both Required
Description Description Both  

 

Tasks - Tasks

OnePlan Fields Wrike Fields Direction Notes
Assigned To ResponsibleIds Both  
Due Due Both  
Effort Effort Both  
Name Title Both Required
Parent Id ParentId Both Required
Start Start Both  
Task Dependencies DependencyIds Both  

 

Lookup Tables – Lookup Tables

OnePlan Fields Wrike fields Direction Notes
       

This table is intentionally left blank.

Available Strategies

OnePlanUpdate

Publish data from Wrike to OnePlan.

This strategy has a filter within the Wrike - OnePlan > Projects – Plans section. This filter will only sync items that are already mapped to OnePlan. Please talk to your OnePlan Contact about filtering the information being brought into OnePlan. If this filter is removed (and not replaced with an alternative filter), all items will be brought into OnePlan.

This strategy will bring in all Wrike projects as plans into OnePlan. Any workspaces the personal access token has access to will be used to find projects. The strategy will also import all tasks associated to the projects into the Schedule in OnePlan. This strategy efficiently processes multiple records simultaneously. Additionally, for consistency and accuracy alignment between Wrike and OnePlan, the strategy will automatically remove tasks from OnePlan if they are deleted in Wrike. This deletion specifically applies to tasks and does not affect plans within OnePlan.

Filters can be applied to this strategy on the Wrike -> OnePlan section, within the Projects -> Plans table. 

OnePlanPublish

Publish data from OnePlan to Wrike.

This strategy has a filter within the OnePlan - Wrike > Plans – Projects section. This filter will only sync items that are already mapped to OnePlan. Please talk to your OnePlan Contact about filtering the information being brought into Wrike.

Filters can be applied to this strategy on the OnePlan -> Wrike section, within the Plans -> Projects table. 

SynchLookups

Sync lookups from Wrike to OnePlan.

This strategy will sync over choice field values on Wrike that are mapped in the Lookup Tables field mappings to a choice field in OnePlan.