Pull Work Items from a Work Type Log into the Main Schedule

  • Updated

You can also pull work items from the work type logs into the schedule so you can see how the item affects the plan schedule. To pull a work item from a Work Type log into the main Schedule:

  1. Go to the Schedule view.

  2. Click the carrot next to the Add Item button, and select Insert Item from the drop-down. A form will open on the right side of the screen.

    Insert_Item.png
  3. Select the Work Type that you want to insert into the main schedule.

    Select_the_Work_Type_to_Insert.png
  4. Select the Work Items that you would like to insert into the schedule.

    Select_Work_Items_to_Insert.png
  5. Click Add to Schedule. The selected items will be added to the bottom of the main schedule.

    Added_Backlog_Items_to_the_Schedule.png

    After clicking Add To Schedule, you wiill notice two things:.

    • You will be prompted to save your Work Plan.

    • There is a new icon next to the work item. If you hover over the icon, a tooltip will show stating that the "Item Is Scheduled."

      Backlog_Item_Is_Scheduled.png